
Survey-grade LiDAR for mining operations across SEQ and Northern NSW. Stockpile volumetrics, pit wall mapping, and tailings dam monitoring β without putting crews in harm's way.
No compromises on accuracy
Enterprise drone platform with RTK positioning and 55-minute flight time
Survey-grade LiDAR with integrated Sony RGB camera
RTK GNSS base station for centimeter-level accuracy
From flight to deliverable β we handle everything
Accurate volume calculations for inventory management and reconciliation
High-resolution wall mapping for geotechnical analysis and stability assessment
Regular monitoring of dam walls and impoundment areas for safety compliance
Elevation data for road design, grade analysis, and drainage planning
Detailed surface models before blasting for volume and fragmentation analysis
Compare before/after models to assess blast performance and muckpile volumes
Six steps from inquiry to deliverable
We work with your team to understand project requirements, timeline, and deliverable specifications.
Our specialists handle all flight planning, regulatory compliance, and equipment preparation.
Our certified pilots conduct the LiDAR drone survey, ensuring comprehensive data collection.
Raw LiDAR data is processed, georeferenced, and quality-checked by our technical team.
You receive clean, classified point cloud data ready for integration into your existing workflows.
We can provide additional deliverables like contour maps, DEMs, or 3D models based on your needs.
Real results for real projects
Monthly stockpile volumetrics across 500-hectare site with multiple active pits.
Weekly drone LiDAR flights with automated processing pipeline.
95% reduction in survey time. $200K saved annually vs traditional methods.
Quarterly safety compliance surveys of 2km dam wall requiring shutdowns.
Drone LiDAR survey without shutdowns or personnel in hazard zones.
Zero shutdowns required. Compliance maintained with 48-hour turnaround.
Grade analysis needed for 15km haul road network across rugged terrain.
Single-day LiDAR capture with DEM and cross-section analysis.
Road redesign saved 12% fuel consumption. Delivered in 48 hours.
Fixed pricing based on site size and complexity
Small sites, single stockpiles
Medium sites, multiple stockpiles
Large sites, ongoing monitoring
Everything you need to know
Get a free quote in 24 hours. No commitment required.